Welcom Nengfa Weiye Group
| HOME PAGE  | NEWS | BRIEF INTRODUCTION OF LIAONING NENGFA WEIYE GROUP | BRIEF INTRODUCTION OF FILIALE | ENERGY MANAGEMENT CONTRACT | 中文 |
Your station:Energy management contract
Service Mode

 Service Mode

ConsultationDiagnosis

    Provide you with consultation advice and overall solution by making energy balance test to energy system, inspecting the operation and management condition of the energy equipment and comprehensive analyzing the problems existed in the system and equipments.

Feasibility studyPlan argumentation

   Make economic and technological comparison and argumentation to the different energy-saving technological transformation plans by taking advantage of our company’s rich information resources and technology reserve, and select the advanced, applicable, economic and feasible transformation plan for clients.

FinancingFund Managing

Our company adopts the “Contract Energy Management” mechanism to provide transformation fund for you.

Equipment SelectionProcurement

   Provide technological support for client in selecting equipments with equipment information resources both inside and outside our country, prepare bidding documents, complete the tendering and procurement process of projects independently and jointly

Engineering Design, Construction and Installation

Provide integrate services for client including engineering design, construction, equipment installation and commissioning 

Operationmaintenance

Entrust our client to make management to the operation and maintenance of equipments

Personnel Training

Provide technical training to managing personnel and operators of equipments for our client.

Unique 007 service

 

To pay by using the energy saving benefit

When the clients entrust the company with an engineering of energy saving transformation, they should pay the advance payment at first, and then pay the other sum of money by using the energy saving benefit. 

To guarantee the energy saving effect

The company should invest in the engineering in advance. And the clients will pay for the engineering if the energy saving effect meets their requirements. 

To share the energy saving benefit

The company should invest in the engineering in advance. During the contract, the company and the clients share the benefit together that results from energy saving and reducing the energy consumption. After the contract, the clients solely share the equipment and the long-term benefit.

To trustee the energy cost chronically

The company manages all the energy cost of the clients and also takes charge of the costs for operation, management, maintenance and transformation the equipment. The company and the clients cooperate and share the benefit together.

 

 

 

Project capacity

Heat supply transformation of the heat source and network;

Transformation of the boilers and units for Power Plant;

Energy saving transformation of industrial kiln and furnace;

Energy saving transformation of motor drive;

Artificial environment of building and building automatic control

Sewage treatment and water recovery;

Utilization of the natural energy and new energy.

 

 

 

 

Cases
Condensed water Recovery Project of Shenyang Chemical Co., Ltd
Utilization of Waste Heat Project of Shenyang Chemical Co., Ltd
Transformation of nitrogen generation system in Shenyang Chemical Industry Co. Ltd
Transformation of in Tieling Water Supply Company
Transformation of ASD in Liaoxi Bohai Building Material Gruop
CFB Boiler Transformation in Anshan No.2 Thermal Power Plant
Transformation of arc furnace in Dalian Steel Co. Ltd
Transformation of ladle refining in Dalian Special Steel Co., Ltd
Transformation of electric-hydraulic hammer in Dandong 518 Plant
Transformation of Low Voltage Distribution Network Project of Liaoning Power Supply Bureau
Transformationf of Green Lighting in Jinzhou Nuerhe Textile Plant
Transformation of ASD in Jinzhou Nuerhe Textile Plant
Transformation of ASD in Liaohe Oil Field
Transformation of heating system in Anshan Sportsman Bicycle Co. Ltd
Transformation of layer-by-layer combustion in Shenyang Automobile Gears Plant
ASD Transformation of Electrode Adjustor of the Electric Arc Furnace in Lingyuan Iron & Steel Company
Transformation with short-cut circuit in Chaoyang Heavy Machine Company
Transformation with new-type short-cut circuit in Benxi Special Steel Co. Ltd
Transformation of furnaces in Haicheng City
Energy Saving Transformation of Glass Tank Furnace and annealing furnace for Shenyang Lamps Company
ASD Transformation of the Pumps in Jinxi Chemical Plant

 


Copyright@2003-2007 www.lnemc.com All rights reserved
Liaoning Nengfa Weiye Group all rights reserved
Tel:024-62103233      Fax:024-25609750       Email:nfwy@lnemc.com      
Admin